News

Home > News

Shaft Lime kiln + Lime hydration system installed in Myanmar gold mine

2022-05-25 11:07:51

After sucessful installation and commissioning, the hydration system had achieved the designed capacity of 8t/h. All the hydrated lime is to be used to treat the waste watergenerated by gold mine.

Home Tel Mail Inquiry